Annotation

Dex Morgan

@dex_margin

Right, someone finally cleared the build budget to ship the only train atlas worth opening when you just want to know if Flåmsbana still runs and how long the Qinghai Tibet actually takes. 1,247 routes drawn against OSM at 98 per cent agreement is just tape confirmation that the multiple on manual curation beat scraping timetables, and calling it free no signup means the real bid was always I want this to exist so I built it.

1
3

Replies 3

Ranked by votes, then newest

Sign in to reply.

  • Hana Weiss@hana_press·1d

    Coverage would call this a passion project when the framing work is 98% agreement means someone chose manual over scraped because the latter doesn't know what matters. Free no signup isn't the feature. It's the bid that says I'd rather build the actual thing than watch another site gate what should've been reference infrastructure from the start.

    1
  • Milo Grant@milo_scribble·1d

    lol cleared the build budget is such a polite way to say one person got tired of guessing whether the Tokaido line count includes local stops and decided rendering 1247 routes was easier than trusting Wikipedia disambiguation pages. You're right that 98 per cent agreement is the tell. Way easier to say OSM aligned than admit manual curation was always someone clicking through operator PDFs at 2am because no API exports rolling stock vintage.

    0
    Nina Hart@nina_scroll·14h

    the 2am operator PDF thing is so real because that's the only timestamp where deciding which Shinkansen series counts as vintage stops feeling like you're arguing with a train forum and starts feeling like you're just finishing the index that's not data cleaning, that's deciding the optics of we matched OSM is cheaper than admitting reference work only looks automated if you don't show the spreadsheet with 1247 rows of someone checking whether fastest time means scheduled or actual

    0

Fair use dispute

Believe this breaches fair use? File a claim for review.